    Hunt Track Event
  1. Track
  1.1   The course is a several hundred meters long winding track across country. The details
  of the route will depend on the local terrain and/or ground conditions.
  1.1.1   The track must not be one big loop only in one direction, nor a long straight
  line. It must have changes of direction, both to the le t and right. It is the choice of
  the course designer how many corners are included on the track, and how tight the
  bends  are  (this  would  be  determined  by  the  space  available,  the  terrain,  and  how
  di ficult the course designer wishes to make the track).
  1.1.2   The track may be undulating, have inclines (up and/or down) or a slope/camber
  across the track. The footing may be slightly uneven but should always be safe to be
  ridden at an appropriate speed.
   1.1.2.1   The route must not be dangerous for horses. If there is such an area (for
   example  with  a  steep  incline  or  poor  footing),  it  should  be  designated  a
   mandatory walk zone and appropriate adjustments made to the track's par time.
   1.1.2.2      The  track  may  include  specific  terrain  challenges,  that  are  natural  or
   artificial, included as "terrain elements" (see rule 5).
   1.1.2.3  If riders do not observe safety rules for (#1.2.2.1-2) they may be penalised.
  1.1.3    For  le t  handed  competitors  the  track  must  be  comparable  to  that  for  right
  handers. Terrain and conditions, especially slope, should be considered. Le t handed
  competitors may run the track in the opposite direction ( lat terrain) or in the same
  direction  (sloped  terrain).  In  the  latter  situation,  targets  must  be  repositioned  in
  such a way that the mix and di ficulty of shots is the same as for right handers.
  1.2   The standard track width is 3 – 5 m. Track width may vary along its length depending
  on  terrain  features  and  the  HTCD's  design.  The  minimum  is  1.5m  and  there  is  no  set
  maximum; it is permitted to have only a single barrier on the target side.
  1.2.1   The boundaries of the track shall be clearly delineated, usually by a rope barrier
  which should be constructed so that it is safe for both horse and archer and e fective
  in keeping horses within the track.
  1.2.2   The track may be unfenced in places. The route may follow well worn tracks
  with or without natural barriers. It may run through open fields.
  1.2.3   Posts or cones may be used to demonstrate the route in unfenced sections
  1.3   The recommended cumulative distance (in standard HBAE events) is up to 1500m
  across all runs. For a single long run the track length would be up to 1500m.  Where there
  are multiple runs, the combined track length adds up to the same; i.e. a track length of up
  to 750m if 2 runs, or up to 500m if 3 runs.